Project Start Time:

2024-06-12 14:21


Construction Progress:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

Install new pipes and supports.

Install new pipes and supports.

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

Job done

Job done

Project Start Time:

2024-06-12 10:03


Construction Progress:

Replace M/E No. 2 cylinder cover

Replace M/E No. 2 cylinder cover

Replace M/E exhaust valve gasket No. 10

Replace M/E exhaust valve gasket No. 10

M/E High pressure oil pump platform replacement

M/E High pressure oil pump platform replacement

Job done

Job done

Project Start Time:

2024-06-09 09:52


Construction Progress:

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Job done

Job done

Project Start Time:

2024-06-04 11:14


Construction Progress:

cutting/ modification installtion on vessel

cutting/ modification installtion on vessel

A.E NO 4 MODIFICATION Aft pipe modification

A.E NO 4 MODIFICATION Aft pipe modification

A.E NO 2 & NO 3 OMD MODIFICATION

A.E NO 2 & NO 3 OMD MODIFICATION

Job done

Job done

Project Start Time:

2024-06-03 16:45


Construction Progress:

Check and cutting clogged scupper

Identify the blocked area of the pipe and cut it

Cleaning pipe & Aft renewnal

Cleaning pipe & Aft renewnal

Take out clogged drill and testing

Take out clogged drill and testing

Job done

Job done

Project Start Time:

2024-06-03 15:52


Construction Progress:

Old lifting eye was cuted

Old lifting eye was cuted

Weld the new lifting eye

Weld the new lifting eye

After PT and load test,painting

After PT and load test,painting

Job done

Job done

Project Start Time:

2024-06-03 15:26


Construction Progress:

Check and cutting old crack plate

Check and cutting old crack plate

Replace new crack plate

Replace new crack plate

UT test

UT to check newly welded crack plate and found to be no leaks.

Job done

Job done

Project Start Time:

2024-06-03 11:32


Construction Progress:

Modification drawing of request

Modification drawing of request

To take measurement 4pcs angle bars for seats welded . And brackets welded,

To take measurement 4pcs angle bars for seats welded . And brackets welded,

Flat bars reinforcement inside

Flat bars reinforcement inside

Job done

Checked with shipside after welding Round bars ,Top plats & Pad eyes .

Project Start Time:

2024-05-30 16:09


Construction Progress:

Grinding & welding by 2 welders

Grinding & welding by 2 welders

After repair condition and paint

After repair condition and paint

Loading test/water bags with class & Ship side

Loading test/water bags with class & Ship side

Job done

Job done

Project Start Time:

2024-05-30 13:53


Construction Progress:

Check for cracks and corrosion in the inlet duct of marine scrubber.

Check for cracks and corrosion in the inlet duct of marine scrubber.

Welding the plates & Grinding smooth:

Welding the plates & Grinding smooth

do a good VT check to prevent missing any areas of welding. PT checking after welding:

Check all welds to avoid welding crack.

Job done

Conclusion / summary

Project Start Time:

2024-05-21 13:54


Construction Progress:

Close the steam valve and remove the trace pipe

After close steam valve, check and dismantle insulation and old the tracing pipe.

Install and test the new tracing pipe

Make a new tracing pipe Install the new tracing pipe and use special tools to fix it ,open steam valve to test ,discover no leak.

Reinstall the new insulation

Reinstall the new insulation

Job done

Job done

Project Start Time:

2024-05-17 13:52


Construction Progress:

Check, put up fire cloth and cut holes

Check, put up fire cloth and cut holes

Make and weld new heavy plate

Make and weld new heavy plate

Install pipe fittings and pipe layout

Install pipe fittings and lay, bind&fix new stainless pipe line and PT

Job done

Job done

< 1234...8 >