Project Name:
Project Start Time:
2026-03-25 13:49
Construction Progress:
Details Of Service
Details Of Service
Preliminary preparations
Preliminary preparations
Bolt tightening and sealing
Bolt tightening and sealing
Job done
Job done
Project Name:
Project Start Time:
2026-03-19 14:23
Construction Progress:
Check and dismantle cross head bolts and accessory
Check and dismantle cross head bolts and accessory
Old slider lifted down M/E platform
Old slider lifted down M/E platform
Install new slider and test
Install new slider and test
Job done
Job done
Project Name:
Project Start Time:
2026-03-18 10:49
Construction Progress:
Details Of Service
Details Of Service
Replace Exhaust Pipe Gasket for No.3 Generator
Replace Exhaust Pipe Gasket for No.3 Generator
Repair Spare Main Engine Piston
Repair Spare Main Engine Piston
Jobs done
Jobs done
Project Start Time:
2025-12-28 15:20
Construction Progress:
Check and dismantle M/E bolts and accessory & Check the lily gold
Check and dismantle M/E bolts and accessory & Check the lily gold
Replace the main bearing bush and reinstall all accessories for inspection
Replace the main bearing bush and reinstall all accessories for inspection
Job done
Job done
Project Name:
Project Start Time:
2025-12-12 15:06
Construction Progress:
All work done listed
All work done listed
Maintenance of the fuel pump
Maintenance of the fuel pump
Maintenance of the fuel pump (No.4-No.6)
Maintenance of the fuel pump (No.4-No.6)
Job done
Job done
Project Name:
Project Start Time:
2025-11-24 13:52
Construction Progress:
Check and disassemble the relevant accessories.
Check and disassemble the relevant accessories.
Adding support for starting air pipe.
Inspect and disassemble the exhaust valve accessory.Drill holes & insert bolts and tighten them.
Adding support for starting air pipe.
Install 7 pieces of support pieces(One piece was left on board as a spare part)
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-11-17 14:27
Construction Progress:
handrails repair
handrails repair
CH access bobby Hatch repair
CH access bobby Hatch repair
Metal fabrication and installation & Pipe Supports renewal &bottom bracket renewal& Lifting Foundation renewal
Metal fabrication and installation & Pipe Supports renewal &bottom bracket renewal& Lifting Foundation renewal
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-10-29 15:49
Construction Progress:
Details Of Service
Details Of Service
Renewal plate :T20mm*1000mm*1600mm
Renewal plate :T20mm*1000mm*1600mm
Tank top plates T20mm*1770mm*3200mm
Tank top plates T20mm*1770mm*3200mm
Ut & Vacuum test
Ut & Vacuum test
Project Name:
Project Start Time:
2025-10-24 15:35
Construction Progress:
After inspection, power off the machine and remove the relevant attachments.
After inspection, power off the machine and remove the relevant attachments.
Secure the old air cooler core and use a hand chain hoist to remove the core.
Secure the old air cooler core and use a hand chain hoist to remove the core.
Clean the mounting surface & install a new air cooler.
Clean the mounting surface & install a new air cooler.
Install all other accessories & test the new air cooler.
Install all other accessories & test the new air cooler.
Project Name:
Project Start Time:
2025-10-23 12:27
Construction Progress:
Inspect and grind the locations that need to be reamed & Cut off the excess boards
Inspect and grind the locations that need to be reamed & Cut off the excess boards
Paint after repair
Paint after repair
Repair of cracks at the support position of the flue gas duct on top of the chimney scrubber tower
Weld after cleaning the crack in the bracket.
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-09-28 09:39
Construction Progress:
Replacement of steam pressure gauge. & Installation of the stern tube oil leakage collector.
Replacement of steam pressure gauge. & Installation of the stern tube oil leakage collector.
Installation of generator exhaust hose. & The copper pipe of the air conditioner compressor is leaking.
Installation of generator exhaust hose. & The copper pipe of the air conditioner compressor is leaking.
Missing scallops on ER side shell stiffeners.
Missing scallops on ER side shell stiffeners.
Jobs done
Jobs done
Project Start Time:
2025-09-05 13:39
Construction Progress:
Inspect and disassemble the components.
Inspect and disassemble the components.
Replace the shaft seal & clean
Replace the shaft seal & clean
Inspect and measure the pipes
Inspect and measure the pipes
Jobs done
Jobs done