Project Start Time:

2026-03-25 13:49


Construction Progress:

Details Of Service

Details Of Service

Preliminary preparations

Preliminary preparations

Bolt tightening and sealing

Bolt tightening and sealing

Job done

Job done

Project Start Time:

2026-03-19 14:23


Construction Progress:

Check and dismantle cross head bolts and accessory

Check and dismantle cross head bolts and accessory

Old slider lifted down M/E platform

Old slider lifted down M/E platform

Install new slider and test

Install new slider and test

Job done

Job done

Project Start Time:

2026-03-18 10:49


Construction Progress:

Details Of Service

Details Of Service

Replace Exhaust Pipe Gasket for No.3 Generator

Replace Exhaust Pipe Gasket for No.3 Generator

Repair Spare Main Engine Piston

Repair Spare Main Engine Piston

Jobs done

Jobs done

Project Start Time:

2025-12-28 15:20


Construction Progress:

Check and dismantle M/E bolts and accessory & Check the lily gold

Check and dismantle M/E bolts and accessory & Check the lily gold

Replace the main bearing bush and reinstall all accessories for inspection

Replace the main bearing bush and reinstall all accessories for inspection

Job done

Job done

Project Start Time:

2025-12-12 15:06


Construction Progress:

All work done listed

All work done listed

Maintenance of the fuel pump

Maintenance of the fuel pump

Maintenance of the fuel pump (No.4-No.6)

Maintenance of the fuel pump (No.4-No.6)

Job done

Job done

Project Start Time:

2025-11-24 13:52


Construction Progress:

Check and disassemble the relevant accessories.

Check and disassemble the relevant accessories.

Adding support for starting air pipe.

Inspect and disassemble the exhaust valve accessory.Drill holes & insert bolts and tighten them.

Adding support for starting air pipe.

Install 7 pieces of support pieces(One piece was left on board as a spare part)

Jobs done

Jobs done

Project Start Time:

2025-11-17 14:27


Construction Progress:

handrails repair

handrails repair

CH access bobby Hatch repair

CH access bobby Hatch repair

Metal fabrication and installation & Pipe Supports renewal &bottom bracket renewal& Lifting Foundation renewal

Metal fabrication and installation & Pipe Supports renewal &bottom bracket renewal& Lifting Foundation renewal

Jobs done

Jobs done

Project Start Time:

2025-10-29 15:49


Construction Progress:

Details Of Service

Details Of Service

Renewal plate :T20mm*1000mm*1600mm

Renewal plate :T20mm*1000mm*1600mm

Tank top plates T20mm*1770mm*3200mm

Tank top plates T20mm*1770mm*3200mm

Ut & Vacuum test

Ut & Vacuum test

Project Start Time:

2025-10-24 15:35


Construction Progress:

After inspection, power off the machine and remove the relevant attachments.

After inspection, power off the machine and remove the relevant attachments.

Secure the old air cooler core and use a hand chain hoist to remove the core.

Secure the old air cooler core and use a hand chain hoist to remove the core.

Clean the mounting surface & install a new air cooler.

Clean the mounting surface & install a new air cooler.

Install all other accessories & test the new air cooler.

Install all other accessories & test the new air cooler.

Project Start Time:

2025-10-23 12:27


Construction Progress:

Inspect and grind the locations that need to be reamed & Cut off the excess boards

Inspect and grind the locations that need to be reamed & Cut off the excess boards

Paint after repair

Paint after repair

Repair of cracks at the support position of the flue gas duct on top of the chimney scrubber tower

Weld after cleaning the crack in the bracket.

Jobs done

Jobs done

Project Start Time:

2025-09-28 09:39


Construction Progress:

Replacement of steam pressure gauge. & Installation of the stern tube oil leakage collector.

Replacement of steam pressure gauge. & Installation of the stern tube oil leakage collector.

Installation of generator exhaust hose. & The copper pipe of the air conditioner compressor is leaking.

Installation of generator exhaust hose. & The copper pipe of the air conditioner compressor is leaking.

Missing scallops on ER side shell stiffeners.

Missing scallops on ER side shell stiffeners.

Jobs done

Jobs done

Project Start Time:

2025-09-05 13:39


Construction Progress:

Inspect and disassemble the components.

Inspect and disassemble the components.

Replace the shaft seal & clean

Replace the shaft seal & clean

Inspect and measure the pipes

Inspect and measure the pipes

Jobs done

Jobs done