Project Start Time:
2025-09-05 09:38
Construction Progress:
Details Of Service
Details Of Service
Picture Report-Telescopic Post
Picture Report-Telescopic Post
Picture Report-Telescopic Post
Picture Report-Telescopic Post
Jobs done
Jobs done
Project Start Time:
2025-08-21 09:36
Construction Progress:
Check and confirm the damaged structure and range.
Inspect the deformed area to determine the damaged structure and its extent that need to be cut.
Replace the damaged structure.
Replace the damaged structure.
Painted and tested.
Painted and tested.
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-08-14 10:59
Construction Progress:
Check and dismantle M/E bolts and accessory
After checking the M/E,dismantle crankcase bolts and accessory and enter the crankcase.
Remove the bolts and connecting rods
After marking the bolts, use a hydraulic tool to remove the bolts and lift the connecting rod with a hand chain hoist
Conduct daily inspections of the bearing shells and install all accessories
After conducting daily inspections and lubrication of the bearing shells, install all accessories
Job done
Job done
Project Name:
Project Start Time:
2025-07-21 12:34
Construction Progress:
Hatch cover at bay46
Hatch cover at bay46
Hatch cover at bay38
Hatch cover at bay38
Hatch cover at bay38
Hatch cover at bay38
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-07-18 15:57
Construction Progress:
D004 The outboard drainage pipe was removed repair.
After inspecting and taking safety measures, hang the hanging cage outside the ship, cut off the protruding pipes and grind them
D005 Safety latch for the four-compartment ballast tank repair.
After inspection, remove the attachments, remeasure the dimensions as required, cut, expand the holes and reinstall.
D006 Hatch cover locking screws change.
Grind the threads, clean and test the ground threads, and install the bolts.
M030 The base bolts of the self-cleaning filter for the M/E hydraulic oil are damaged.
M030 The base bolts of the self-cleaning filter for the M/E hydraulic oil are damaged.
Project Name:
Project Start Time:
2025-07-12 09:33
Construction Progress:
Check and Mark the range according to the leakage area,remove steam release valve.
Check and Mark the range according to the leakage area,remove steam release valve.
Close the bleed valve and turn on the auxiliary blower.
Close the bleed valve and turn on the auxiliary blower.
Stainless steel plugs leaking stoppage and test & Reinstall the air cooler valve、Bolts and connecting pipes.
Stainless steel plugs leaking stoppage and test & Reinstall the air cooler valve、Bolts and connecting pipes.
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-07-08 10:49
Construction Progress:
M008 Oil mist header for the rear chimney ventilation pipe repair
Check and Open the oil mist box for ventilation & Clean up the oil spill.
Set up the hoisting cage and weld the oil collection trough.
Set up the hoisting cage and weld the oil collection trough.
H0027 Jacks for the two top covers at the rear of the cargo hold repair.
H0027 Jacks for the two top covers at the rear of the cargo hold repair.
Jobs done
Jobs done
Project Name:
Project Start Time:
2025-06-25 14:10
Construction Progress:
Check and dismantle Rocker arm bolts and accessory
Check and dismantle Rocker arm bolts and accessory
Replace and install the rocker arm
Replace and install the rocker arm
Install other accessories and test them
Install other accessories and test them
Job done
Job done
Project Start Time:
2025-06-24 16:13
Construction Progress:
Check and dismantle Cylinder head bolt and accessory
Check and dismantle Cylinder head bolt and accessory
Replace the new cylinder head bolts
Replace the new cylinder head bolts
Replace and install new cylinder head packing
Replace and install new cylinder head packing
Job done
Job done
Project Start Time:
2025-06-19 13:24
Construction Progress:
Details Of Service
Details Of Service
Manifold NO.1
Manifold NO.1
Manifold NO.2
Manifold NO.2
Exhaust manifold inside NO1-NO12
Exhaust manifold inside NO1-NO12
Project Name:
Project Start Time:
2025-05-28 17:03
Construction Progress:
Cleaning suction hood in galley
Cleaning suction hood in galley
Galley trunk and fire dampe cleaning with Special cleaning agent
Galley trunk and fire dampe cleaning with Special cleaning agent
Check with a robot
Reassembly access hole & Waste oil sludge dispose
Job done
Job done
Project Name:
Project Start Time:
2025-05-27 11:35
Construction Progress:
Inspect and confirm the damaged area
Inspect and confirm the damaged area, and prepare safe construction conditions and fire prevention work.
Weld and bind the bridge
Rust removal and cleaning of the surface of the damaged parts, cutting, welding and polishing the binding bridge
After welding
After welding
Job done
Job done