Project Start Time:

2025-09-05 09:38


Construction Progress:

Details Of Service

Details Of Service

Picture Report-Telescopic Post

Picture Report-Telescopic Post

Picture Report-Telescopic Post

Picture Report-Telescopic Post

Jobs done

Jobs done

Project Start Time:

2025-08-21 09:36


Construction Progress:

Check and confirm the damaged structure and range.

Inspect the deformed area to determine the damaged structure and its extent that need to be cut.

Replace the damaged structure.

Replace the damaged structure.

Painted and tested.

Painted and tested.

Jobs done

Jobs done

Project Start Time:

2025-08-14 10:59


Construction Progress:

Check and dismantle M/E bolts and accessory

After checking the M/E,dismantle crankcase bolts and accessory and enter the crankcase.

Remove the bolts and connecting rods

After marking the bolts, use a hydraulic tool to remove the bolts and lift the connecting rod with a hand chain hoist

Conduct daily inspections of the bearing shells and install all accessories

After conducting daily inspections and lubrication of the bearing shells, install all accessories

Job done

Job done

Project Start Time:

2025-07-21 12:34


Construction Progress:

Hatch cover at bay46

Hatch cover at bay46

Hatch cover at bay38

Hatch cover at bay38

Hatch cover at bay38

Hatch cover at bay38

Jobs done

Jobs done

Project Start Time:

2025-07-18 15:57


Construction Progress:

D004 The outboard drainage pipe was removed repair.

After inspecting and taking safety measures, hang the hanging cage outside the ship, cut off the protruding pipes and grind them

D005 Safety latch for the four-compartment ballast tank repair.

After inspection, remove the attachments, remeasure the dimensions as required, cut, expand the holes and reinstall.

D006 Hatch cover locking screws change.

Grind the threads, clean and test the ground threads, and install the bolts.

M030 The base bolts of the self-cleaning filter for the M/E hydraulic oil are damaged.

M030 The base bolts of the self-cleaning filter for the M/E hydraulic oil are damaged.

Project Start Time:

2025-07-12 09:33


Construction Progress:

Check and Mark the range according to the leakage area,remove steam release valve.

Check and Mark the range according to the leakage area,remove steam release valve.

Close the bleed valve and turn on the auxiliary blower.

Close the bleed valve and turn on the auxiliary blower.

Stainless steel plugs leaking stoppage and test & Reinstall the air cooler valve、Bolts and connecting pipes.

Stainless steel plugs leaking stoppage and test & Reinstall the air cooler valve、Bolts and connecting pipes.

Jobs done

Jobs done

Project Start Time:

2025-07-08 10:49


Construction Progress:

M008 Oil mist header for the rear chimney ventilation pipe repair

Check and Open the oil mist box for ventilation & Clean up the oil spill.

Set up the hoisting cage and weld the oil collection trough.

Set up the hoisting cage and weld the oil collection trough.

H0027 Jacks for the two top covers at the rear of the cargo hold repair.

H0027 Jacks for the two top covers at the rear of the cargo hold repair.

Jobs done

Jobs done

Project Start Time:

2025-06-25 14:10


Construction Progress:

Check and dismantle Rocker arm bolts and accessory

Check and dismantle Rocker arm bolts and accessory

Replace and install the rocker arm

Replace and install the rocker arm

Install other accessories and test them

Install other accessories and test them

Job done

Job done

Project Start Time:

2025-06-24 16:13


Construction Progress:

Check and dismantle Cylinder head bolt and accessory

Check and dismantle Cylinder head bolt and accessory

Replace the new cylinder head bolts

Replace the new cylinder head bolts

Replace and install new cylinder head packing

Replace and install new cylinder head packing

Job done

Job done

Project Start Time:

2025-06-19 13:24


Construction Progress:

Details Of Service

Details Of Service

Manifold NO.1

Manifold NO.1

Manifold NO.2

Manifold NO.2

Exhaust manifold inside NO1-NO12

Exhaust manifold inside NO1-NO12

Project Start Time:

2025-05-28 17:03


Construction Progress:

Cleaning suction hood in galley

Cleaning suction hood in galley

Galley trunk and fire dampe cleaning with Special cleaning agent

Galley trunk and fire dampe cleaning with Special cleaning agent

Check with a robot

Reassembly access hole & Waste oil sludge dispose

Job done

Job done

Project Start Time:

2025-05-27 11:35


Construction Progress:

Inspect and confirm the damaged area

Inspect and confirm the damaged area, and prepare safe construction conditions and fire prevention work.

Weld and bind the bridge

Rust removal and cleaning of the surface of the damaged parts, cutting, welding and polishing the binding bridge

After welding

After welding

Job done

Job done