Project Start Time:

2025-05-20 11:36


Construction Progress:

Fault Location & Pre-Repair Preparations

Fault Location & Pre-Repair Preparations

CYLINDER OVERHAULING & SEAL KITS REPLACEMENT

CYLINDER OVERHAULING & SEAL KITS REPLACEMENT

Reassemble pin and safety piece

Reassemble pin and safety piece

Jobs done

Jobs done

Project Start Time:

2025-05-11 15:43


Construction Progress:

Check and dismantle M/E lubricating oil pipe bolts and accessory

After checking the M/E lubricating oil pipe, use tools dismantle bolts and accessories.

Cut and Replaced new lubricating oil pipe

Cut and Replaced new lubricating oil pipe

Reinstall of M/E lubricating oil pipe all accessories

Reinstall of M/E lubricating oil pipe all accessories

Check and dismantle bolts and accessory

Replace and install new bolts, install all accessories.

Project Start Time:

2025-04-23 16:50


Construction Progress:

Check and clean the Draft marks that need to be painted.

Arrange small boats to approach the area that needs painting and clean it..

Set up scaffolding and paint it.

Set up scaffolding and paint it.

Check the draft mark after completion

Check the draft mark after completion

Job done

Job done

Project Start Time:

2025-04-23 10:39


Construction Progress:

Check and clean the Draft marks that need to be painted.

Arrange small boats to approach the area that needs painting and clean it..

Set up scaffolding and paint it.

Set up scaffolding and paint it.

Check the draft mark after completion

Check the draft mark after completion

Job done

Job done

Project Start Time:

2025-04-14 11:57


Construction Progress:

Confirmed the damaged parts

Confirmed the damaged parts

Cutting damage cell guide

Cutting damage cell guide

Fix new cell guide

Fix new cell guide

New cell guide be fitted with full welding

New cell guide be fitted with full welding

Project Start Time:

2025-03-28 13:25


Construction Progress:

The intermediate platform of M/E SCR and No.1/No.2 D/G SCR is shock-proof. & M/E,D/G oil change valve FCV-6 safety valve.

Cut boards as required, sand and fasten, and weld brackets.

There are multiple air leaks between M/E SCR and RTV valves and black smoke is emitted to prevent leakage.

There are multiple air leaks between M/E SCR and RTV valves and black smoke is emitted to prevent leakage.

Engine room 3 deck CO2 fire extinguisher displaced. & Bridge wing life buoy support modification.

Engine room 3 deck CO2 fire extinguisher displaced. & Bridge wing life buoy support modification.

No.11 SWBT(P & S) sounding tube lengthening and support welding.

Sand the weld area, secure and weld the bracket.

Project Start Time:

2025-03-14 10:12


Construction Progress:

Details Of Service

Details Of Service

Picture Report

Picture Report

Inspect and repair

Inspect and repair

Job done

Job done

Project Start Time:

2025-03-12 15:04


Construction Progress:

Location of Cracks in the Exhaust Manifold

Location of Cracks in the Exhaust Manifold

No.1 & No.2 Crack Repair(gouging/grinding /welding and grinding and PT)

No.1 & No.2 Crack Repair(gouging/grinding /welding and grinding and PT)

Collar plate

Collar plate

Exhaust boiler insulation

Exhaust boiler insulation

Project Start Time:

2025-03-07 11:27


Construction Progress:

Cleaning main pipes

Cleaning main pipes

Before and after the main air duct line cleaning & Before and after the branch air duct line cleaning

Before and after the main air duct line cleaning & Before and after the branch air duct line cleaning

Cleaning oil suction inlet & Remove exhaust cover and fan

Cleaning oil suction inlet & Remove exhaust cover and fan

Job done

Job done

Project Start Time:

2025-03-04 15:53


Construction Progress:

A, Suports of plateform crack repair

A, Suports of plateform crack repair

Scaveng manifold repair

Scaveng manifold repair

Scaveng manifold support repair

Scaveng manifold support repair

Exhaust manifold inside posision E1 & E2 & E3

Exhaust manifold inside posision E1 & E2 & E3

Project Start Time:

2025-02-21 11:41


Construction Progress:

Check and dismantle M/E Exhaust valve bolts and accessory

Check and dismantle M/E Exhaust valve bolts and accessory

Remove and repair and clean the exhaust valve

Remove and repair and clean the exhaust valve

Reinstall all accessories &Check and remove pipe bolts

Reinstall all accessories &Check and remove pipe bolts

Re-bolt the pipe and test the seal

Re-bolt the pipe and test the seal

Project Start Time:

2025-02-09 14:55


Construction Progress:

Tail shaft

Tail shaft

Rudder blade

Rudder blade

Seawater pipe

Seawater pipe

Main seawater pipe

Main seawater pipe