Project Name:
HATCH CYLINDER OVERHUALING FOR M/V LADY ROSE
Project Start Time:
2025-05-20 11:36
Decoration style:
othere
Project description:
As Requested, Our Service Team Attended The Subject Vessel On 25th Apr. 2024, During Her alongside at NanGang Port of SHA China. The Reason For Attendance Was Provide Service For Hatch Cylinder Overhauling All Work Done Listed As Below:
Progress:
Fault Location & Pre-Repair Preparations








The leakage cylinder at No.4 deck AFT | Dismantle hose and drain hydrauilc oil | Cutting off the obstructive pipe | Remark the position on end cover | Security before remove pin | After remove safety piece and pin | Remove piston from cylinder body | Checked and inspection | Dismantle piston | New seal kit from ship side | Renewal seal kit | Reassembly pistion | Made screw stoper hole | Reassemble piston with new sealing | Reassemble pin and safety piece | Tight end cover | Connect hydraulic oil hose | Testing in good condition
Progress:
CYLINDER OVERHAULING & SEAL KITS REPLACEMENT






















Progress:
Reassemble pin and safety piece




Progress:
Jobs done