Project Name:
ME Fuel pump overhaul for M/V Canal
Project Start Time:
2025-12-12 15:06
Decoration style:
M/E Overhaul
Project description:
As requested, our service team attended the subject vessel between 20th nov & 21th nov . During her berthing at Jingtang terminal, China. The reason for attendance was to provide service for ME fuel pump overhaul.
Progress:
All work done listed
All work done listed as below:
-
1.Pre‑maintenance prep: Implemented lockout‑tagout (LOTO) on main engine system to isolate oil & power. Cleaned fuel pump surface & prepped spares (oil seals, filter elements, bearings).
-
2.Disassembly & inspection: Dismantled pump per safety manual. Inspected gear teeth – no wear pitting/deformation. Measured gear clearance (feeler gauge): within std. 0.15–0.25 mm. Left‑end bearing slightly loose. Oil seal aged/cracked; filter clogged with metal particles.
-
3.Component maintenance & replacement: Replaced loose bearing, aged oil seal & clogged filter. Cleaned pump body, oil passages & suction pipe with diesel to remove residues. Replaced pump barrel. Applied sealant to pump cover joint to prevent leakage.
-
4.Reassembly: Reassembled components in reverse order. Torqued bolts to spec to avoid uneven pump body stress.
-
5.Test: Ran 30 min observation – no leakage. Pump noise normal, operation smooth, no abnormal vibration.
Photos for reference:
Progress:
Maintenance of the fuel pump












































Progress:
Maintenance of the fuel pump (No.4-No.6)





















Progress:
Job done