Project Name:
NO.6 Oil Tank STB Crack Repair For M/V GRANDE HOUSTON
Project Start Time:
2026-09-01 15:47
Decoration style:
othere
Project description:
According to the ship information provided by the owner,the NO.6 Oil Tank STB Crack needs to be repaired, so from the SEAWAVE service team were at the port of taicang on 3 ,April 2026 to carry out the repair work.
Progress:
Details Of Service
According to the ship information provided by the owner,the NO.6 Oil Tank STB Crack needs to be repaired, so from the SEAWAVE service team were at the port of taicang on 3 ,April 2026 to carry out the repair work.
1. Preparation
- 1.1 Gas free, isolate and prepare work area
- 1.2 Install ventilation and lighting
- 1.3 Inspect crack position
- 1.4 Check crack condition
2. Crack Treatment
- 2.1 Grind the crack area
- 2.2 PT test to confirm crack length
3. Welding Repair & Inspection
- 3.1 Gouge crack and perform welding
- 3.2 Grind weld and final PT inspection
Progress:
Preparatory Operations




Progress:
Crack Treatment


Progress:
Welding Repair & Inspection

