Project Name:
Installation of supporting brackets for CO₂ tank – M/V CM SHEN ZHEN
Project Start Time:
2026-05-12 09:05
Decoration style:
othere
Project description:
Per owner's vessel data, repair scope includes transporting components to position followed by positioning, drilling, installation and welding. SEAWAVE service team arrived at Shanghai Port on 19 Apr 2026 to execute the work.
Progress:
Site Preparation & Material/Structure Positioning



Progress:
Component Pre-Fit & Temporary Fixing






Progress:
Formal Full Welding Operation & Post-Weld Treatment



Progress:
Final Inspection & Work Completion






Position structural support bracket on-site, ready for repair and reinforcement. | Conduct full side view inspection and alignment check of steel support structure. | Arrange welding gear and prepare area for hot work. | Perform pre-inspection and cleaning of all base welding joints. | Pre-position and tack-align reinforcement plate at installation site. | Install and weld additional triangular reinforcing bracket at support foot. | Check overall full view of support structure post-primary tack welding. | Inspect close-up of completed temporary tack weld reinforcement at deck base. | Conduct final positioning check before full continuous welding. | Perform on-site formal welding of structural base joint. | Complete final full penetration welding for all connection joints. | Execute post-weld cleaning, grinding and paint touch-up on seams. | Conduct final overall alignment check for all installed steel supports. | Conduct final inspection and acceptance of reinforcement works. | Conduct final inspection and acceptance of reinforcement works.