Project Start Time:

2023-12-04 11:43


Construction Progress:

1# Aux blower renewed with improve design.

1# Aux blower renewed with improve design.

M-0844 ME FREE END PLATFORM STRUCTURE STIFFENING

M-0844 ME FREE END PLATFORM STRUCTURE STIFFENING

Claim M-0258 EXV GUIDE BUSH O-RING

Claim M-0258 EXV GUIDE BUSH O-RING

Other tasks

Other tasks

Project Start Time:

2023-12-01 11:45


Construction Progress:

ADDITIONAL PLATFORM DG7648

ADDITIONAL PLATFORM DG7648

No.1 AUX blower impeller renewal

No.1 AUX blower impeller renewal

No.2 AUX blower impeller renewal

No.2 AUX blower impeller renewal

SUPPORT FOR FUEL OIL PIPES

SUPPORT FOR FUEL OIL PIPES

Project Start Time:

2023-11-21 15:02


Construction Progress:

dismantled the old leakage pipe

dismantled the old leakage pipe

new pipe fabricated and replace

new pipe fabricated and replace

new pipe installing

new pipe installing

Jobs Done

Jobs Done

Project Start Time:

2023-11-20 11:52


Construction Progress:

Unit No.1~No.12 Cylinder Cover Overhauled and Unit No.1, No.7 And No.11 Piston Overhauled.

Unit No.1~No.12 Cylinder Cover Overhauled and Unit No.1, No.7 And No.11 Piston Overhauled.

Unit No.1, No.7 And No.11 Stuffing Box Overhauled and Unit No.1 And No.7 Cylinder Liner Overhauled.

Unit No.1, No.7 And No.11 Stuffing Box Overhauled and Unit No.1 And No.7 Cylinder Liner Overhauled.

ME Bearing Inspection and Crank Case Oil Outlet Guide Rubber Diaphragms Changed

ME Bearing Inspection and Crank Case Oil Outlet Guide Rubber Diaphragms Changed

Chain Drive Inspected And Rubber Guide Replaced With New Parts and Measure data report

Chain Drive Inspected And Rubber Guide Replaced With New Parts and Measure data report

Project Start Time:

2023-11-17 16:47


Construction Progress:

Unit No.1~No.7 Cylinder Cover Overhauled

Unit No.1~No.7 Cylinder Cover Overhauled

Unit No.1~ No.7 Piston Overhauled

Unit No.1~ No.7 Piston Overhauled

Unit No.1~No.7 Cylinder Liner Overhauled

Unit No.1~No.7 Cylinder Liner Overhauled

Running test and record

Running test and record

Project Start Time:

2023-11-17 13:12


Construction Progress:

Unit No.1~No.7 Cylinder Cover Overhauled

Unit No.1~No.7 Cylinder Cover Overhauled

Unit No.1~ No.7 Piston Overhauled.

Unit No.1~ No.7 Piston Overhauled.

Unit No.2 ~ No.7 Cylinder Liner Renew

Unit No.2 ~ No.7 Cylinder Liner Renew

Main air starting valve overhaul

Main air starting valve overhaul

Project Start Time:

2023-11-16 11:10


Construction Progress:

wall treatment

wall treatment

Lay, bind &fix new stainless pipe line

Lay, bind &fix new stainless pipe line

Separate connect sampling pipe

Separate connect sampling pipe

Job Done

Job Done

Project Start Time:

2023-11-14 16:35


Construction Progress:

Preparation for overhaul

Preparation for overhaul

Disassembly, inspection and maintenance of related accessories

Disassembly, inspection and maintenance of related accessories

Aftre-assembly complate shall running test

Aftre-assembly complate shall running test

Job Done

Job Done

Project Start Time:

2023-11-14 11:15


Construction Progress:

Before Install Insulation

Before Install Insulation

installation

installation

After complete installation

After complete installation

Job Done

Job Done

Project Start Time:

2023-11-14 09:38


Construction Progress:

Preparation for maintenance

Preparation for maintenance

UNIT NO 2 OVERHAUL

UNIT NO 2 OVERHAUL

UNIT NO 3 OVERHAUL

UNIT NO 3 OVERHAUL

Job Done

Job Done

Project Start Time:

2023-11-13 18:37


Construction Progress:

Preparation for overhaul

Preparation for overhaul

Maintenance process for Unit No.1

Maintenance process for Unit No.1

Maintenance process for Unit No.5

Maintenance process for Unit No.5

Job Done

Job Done

Project Start Time:

2023-11-13 16:43


Construction Progress:

Disassemble gangway platform pin

Disassemble gangway platform pin

Install new gangway platform pin

Install new gangway platform pin

Reinstall the gangway platform

Reinstall the gangway platform

Load test of accommodation ladder

Load test of accommodation ladder