Samsun A/E No. 3  Overhaul

Project Name:

Samsun A/E No. 3 Overhaul

Project Start Time:

2023-11-14 16:35


Decoration style:

A/E Overhaul

Project description:

A/E NO3 Need Carry Out Overhaul During Vessel In Dry Dock At YouLian Shipyard


Progress:

Preparation for overhaul

Preparation for overhaul

Deflection measurment before onverhaul     
Dismantle pipe and parts necessary    
NO.3 Cylinder Cover bolt remove     
Injection     

Progress:

Disassembly, inspection and maintenance of related accessories

Disassembly, inspection and maintenance of related accessories

Open the cyl cover
Air starter dismantled 
Measurment connecting rod 
Diassembly connecting rod 
Liner measurment
Liner cleaned and measurment
Liner cleaned
Connecting rod measurment and recorder
Pistion head measurment
Conecting rod pin measurment
Cyl cover cleaning
New parts need renewal
Vavle seats renewed
Vavle seat leakge check
Cooling jacket cleaning
Cooling jacket cleaned
Cyl cover cleaned 
Aft lapping cyl cover overhaul complate
Cyl cover leakage testing by 6bar
Main bearing inspection
Trust washer inspection 
Crank pin measurment and recorder
Rocap disassemble /inspection
Conecting rod measurment wiht bearing and without bearing
Pistion unit cleaned and piston ring renewal nesscery
Re-assembly piston unit
Re-assembly 
Timing adjustment
Crank case cleaning

Progress:

Aftre-assembly complate shall running test

Aftre-assembly complate shall running test

Crank case cleaning    Aftre-assembly complate shall running test    
Aft load test open the crank casing to check    
Loading testing to 200kw

Progress:

Job Done

Job Done