Project Start Time:

2023-12-13 18:15


Construction Progress:

part 1

part 1

part 2

part 2

part 3

part 3

part 4

part 4

Project Start Time:

2023-12-13 17:28


Construction Progress:

part 1

part 1

part 2

part 2

part 3

part 3

Job done

Job done

Project Start Time:

2023-12-13 16:52


Construction Progress:

part 1

part 1

part 2

part 2

part 3

part 3

Job done

Job done

Project Start Time:

2023-12-13 16:22


Construction Progress:

Cutting off old lights frame /Disconnect cables

Cutting off old lights frame /Disconnect cables

Shifting new frame on position /Installing Welding

Shifting new frame on position /Installing Welding

Connecting with cables and testing

Connecting with cables and testing

Job done

Job done

Project Start Time:

2023-12-13 15:50


Construction Progress:

Taking measurement on board when calling Shanghai terminal

Taking measurement on board when calling Shanghai terminal

Fabrication at workshop

Fabrication at workshop

Removal of existing vents

Removal of existing vents

Installation of new ventilation covers

Installation of new ventilation covers

Project Start Time:

2023-12-13 15:12


Construction Progress:

Remove accessories and cylinder cover.

Remove accessories and cylinder cover.

Sand cylinder liner and replace piston ring.

Sand cylinder liner and replace piston ring.

Sand cylinder liner and replace piston ring.

Sand cylinder liner and replace piston ring.

Assemble piston and cylinder cover.

Assemble piston and cylinder cover.

Project Start Time:

2023-12-13 11:38


Construction Progress:

Inspection crane jib

Inspection crane jib

Repair crane jib deformation

Repair crane jib deformation

Correct the remaining deformation of crane jib

Correct the remaining deformation of crane jib

Water bag load test

Water bag load test

Project Start Time:

2023-12-13 08:57


Construction Progress:

we go anchorage gas cutting by barge

we go anchorage gas cutting by barge

anchorage gas cutting

anchorage gas cutting

Unraveling Anchors

Unraveling Anchors

Job done

Job done

Project Start Time:

2023-12-11 11:45


Construction Progress:

ADDITIONAL PLATFORM DG7648

According to the request all additional supports were reinforced

Main engine auxiliary blower #02 cracks on impeller blades

As request CMD service team attendance onboard for replace impeller on ME blower 2#.

High vibration: Damaged sealing oil pipe (unit #12-Fuel side GAV)

Replace new sealing oil pipe

Job done

Job done

Project Start Time:

2023-12-08 10:31


Construction Progress:

PIPE BRACKET FOR LUB OUILL PIPING CYL 7

Drill 6mm hole and add install new bracket.

M-0468 LOCKING DEVICE CRANKCASE DOOR10

Install new locking device and full welding

M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT

Replace No.1,No2,No.3 water mist catcher for updated brackets with new gasket

M-0490 TOP BRACING 4 CONNET BE ADJUSTED

Adjust top bracing 4 and show to 2/E

Project Start Time:

2023-12-07 10:21


Construction Progress:

Additional platform DG 7648

According to the request provided supports and welding reinforced

Insulation material for exhaust valve expansion piece

Provided insulation and cover piece materials and renewal Cyl1#---Cyl12#

replace new insulation and Install new design cover piece

replace new insulation and Install new design cover piece

Job done

Job done

Project Start Time:

2023-12-06 09:06


Construction Progress:

M-0554 crankcase rubber gasket replacement

M-0554 crankcase rubber gasket replacement

M-0590 fuel injection pipe(icu to fiv)bottom support missing cylinder 1 to 12

M-0590 fuel injection pipe(icu to fiv)bottom support missing cylinder 1 to 12

Replace new impeller and test

M-0658 no.1 aux.blower impeller crack

Job done

Job done