Project Start Time:
2023-12-13 18:15
Construction Progress:
part 1
part 1
part 2
part 2
part 3
part 3
part 4
part 4
Project Name:
Project Start Time:
2023-12-13 17:28
Construction Progress:
part 1
part 1
part 2
part 2
part 3
part 3
Job done
Job done
Project Start Time:
2023-12-13 16:52
Construction Progress:
part 1
part 1
part 2
part 2
part 3
part 3
Job done
Job done
Project Name:
Project Start Time:
2023-12-13 16:22
Construction Progress:
Cutting off old lights frame /Disconnect cables
Cutting off old lights frame /Disconnect cables
Shifting new frame on position /Installing Welding
Shifting new frame on position /Installing Welding
Connecting with cables and testing
Connecting with cables and testing
Job done
Job done
Project Name:
Project Start Time:
2023-12-13 15:50
Construction Progress:
Taking measurement on board when calling Shanghai terminal
Taking measurement on board when calling Shanghai terminal
Fabrication at workshop
Fabrication at workshop
Removal of existing vents
Removal of existing vents
Installation of new ventilation covers
Installation of new ventilation covers
Project Name:
Project Start Time:
2023-12-13 15:12
Construction Progress:
Remove accessories and cylinder cover.
Remove accessories and cylinder cover.
Sand cylinder liner and replace piston ring.
Sand cylinder liner and replace piston ring.
Sand cylinder liner and replace piston ring.
Sand cylinder liner and replace piston ring.
Assemble piston and cylinder cover.
Assemble piston and cylinder cover.
Project Name:
Project Start Time:
2023-12-13 11:38
Construction Progress:
Inspection crane jib
Inspection crane jib
Repair crane jib deformation
Repair crane jib deformation
Correct the remaining deformation of crane jib
Correct the remaining deformation of crane jib
Water bag load test
Water bag load test
Project Name:
Project Start Time:
2023-12-13 08:57
Construction Progress:
we go anchorage gas cutting by barge
we go anchorage gas cutting by barge
anchorage gas cutting
anchorage gas cutting
Unraveling Anchors
Unraveling Anchors
Job done
Job done
Project Name:
Project Start Time:
2023-12-11 11:45
Construction Progress:
ADDITIONAL PLATFORM DG7648
According to the request all additional supports were reinforced
Main engine auxiliary blower #02 cracks on impeller blades
As request CMD service team attendance onboard for replace impeller on ME blower 2#.
High vibration: Damaged sealing oil pipe (unit #12-Fuel side GAV)
Replace new sealing oil pipe
Job done
Job done
Project Name:
Project Start Time:
2023-12-08 10:31
Construction Progress:
PIPE BRACKET FOR LUB OUILL PIPING CYL 7
Drill 6mm hole and add install new bracket.
M-0468 LOCKING DEVICE CRANKCASE DOOR10
Install new locking device and full welding
M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT
Replace No.1,No2,No.3 water mist catcher for updated brackets with new gasket
M-0490 TOP BRACING 4 CONNET BE ADJUSTED
Adjust top bracing 4 and show to 2/E
Project Name:
Project Start Time:
2023-12-07 10:21
Construction Progress:
Additional platform DG 7648
According to the request provided supports and welding reinforced
Insulation material for exhaust valve expansion piece
Provided insulation and cover piece materials and renewal Cyl1#---Cyl12#
replace new insulation and Install new design cover piece
replace new insulation and Install new design cover piece
Job done
Job done
Project Start Time:
2023-12-06 09:06
Construction Progress:
M-0554 crankcase rubber gasket replacement
M-0554 crankcase rubber gasket replacement
M-0590 fuel injection pipe(icu to fiv)bottom support missing cylinder 1 to 12
M-0590 fuel injection pipe(icu to fiv)bottom support missing cylinder 1 to 12
Replace new impeller and test
M-0658 no.1 aux.blower impeller crack
Job done
Job done