Project Name:
M/V Aston Trader crane jib repair work
Project Start Time:
2023-12-13 11:38
Decoration style:
othere
Project description:
According to the owner's information, the crane jib part of the ship is seriously deformed and needs to be repaired.
Progress:
Inspection crane jib
Check the condition of the crane jib and determine the location of the deformation to be repaired.


Progress:
Repair crane jib deformation
(1)Scaffolding is set up at the work site and deformed jib plates are cut.
(2)Make new jib plates, replace and install new jib plates by welding and grinding.
(3)Non-destructive testing by classification society surveyors.












Progress:
Correct the remaining deformation of crane jib
Make special tools and use special tools to heat and correct deformed jib.


Progress:
Water bag load test
The water bag was hung on the repaired crane jib, and the water was injected continuously to meet the specified load requirements, and finally the test was completed and the water was discharged.