Project Name:
Repair service of CMA CGM TROCADERO
Project Start Time:
2023-12-01 11:45
Decoration style:
othere
Project description:
Additional platforms and blower impellers renewal
Progress:
ADDITIONAL PLATFORM DG7648
New design support drawing
Lay fire blankets for Protective ME cable
Install and welding the new support
Intervened with in use pipes
After add reinforced








Progress:
No.1 AUX blower impeller renewal
No.1 AUX blower impeller renewal
Dismantled all the bolts
Remove the motor with impeller
Dismantled the old damaged impeller
Cracks in the impeller were found
Remove the cover of sealing
Clean the end cap sludge waste
Renewal the sealings
Install new impeller
Tighten the bolts and re-secure

















Progress:
No.2 AUX blower impeller renewal
No.2 AUX blower impeller renewal
Dismantled Aux motor
Remove old impeller
Remove sealing cover
Clean the end cap sludge waste
Renewal the sealings
Install new impeller
Tighten the bolts and re-secure
Re-assembled motor with new design impeller








No.2 AUX blower old impeller re-fit back
After replace impeller ,when shipside test Aux blower can't start the motor, Cause the impeller and the baffle stuck.
After inspection, it was found that the impeller was deformed, and new spare parts could not be provided in a short time at this time, and it was finally decided to reinstall the old impeller
Remover deformed new impeller
Deformed new impeller
Contact position between impeller and deflector
Reinstall old impeller
Re-assembled motor with old impeller






Progress:
SUPPORT FOR FUEL OIL PIPES
Check/inspection with 2/E, The crew thought that there was no need to weld in the later stage, and the crew installed the pipe clamp by ship crew, this clam could be closed
A position will be add clamp by crew
C position welding done