Project Start Time:

2024-07-15 14:57


Construction Progress:

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Claim M-1039 ME top bracing n°3 damaged - internal breakage

Claim M-1039 ME top bracing n°3 damaged - internal breakage

Job done

Job done

Project Start Time:

2024-07-13 11:40


Construction Progress:

Check and dismantle No1,No2,air cooler manhole

Check and dismantle No1,No2,air cooler manhole related bolts and accessories.

Install and weld and polish support blocks and support beams.

Install and weld and polish support blocks and support beams.

Paint the weld of the support block.

Paint the weld of the support block.

Job done

Job done

Project Start Time:

2024-07-11 16:02


Construction Progress:

AFT SEAL

AFT SEAL

FWD Seal

FWD Seal

Work Pictures

Work Pictures

Job done

Job done

Project Start Time:

2024-07-08 16:28


Construction Progress:

Background:There are cracks and corrosion of inlet duct of marine scrubbers.

Background:There are cracks and corrosion of inlet duct of marine scrubbers.

Repair welding: Repair the corrosion and leakage of the weld(starboard and port).

Repair welding: Repair the corrosion and leakage of the weld(starboard and port).

grinding and PT check

grinding and PT check

Job done

Job done

Project Start Time:

2024-07-05 16:56


Construction Progress:

Check and open holes for installing air conditioners.

Check and open holes for installing air conditioners.

Air-conditioning installation lines.

Air-conditioning installation lines.

Installation completed and test operation is normal.

Installation completed and test operation is normal.

Job done

Job done

Project Start Time:

2024-07-05 13:34


Construction Progress:

Disassemble and inspect the air cooler and accessories.

Disassemble and inspect the air cooler and accessories.

Perform leak test on the air cooler and plug the leak.

Perform leak test on the air cooler and plug the leak.

Reinstall the air cooler and accessories and tighten the bolts.

Reinstall the air cooler and accessories and tighten the bolts.

Job done

Job done

Project Start Time:

2024-07-03 13:17


Construction Progress:

Disassemble and inspect the air cooler and accessories.

Disassemble and inspect the air cooler and accessories.

Perform leak test on the air cooler and replaced air cooler pipes*6pcs.

Perform leak test on the air cooler and replaced air cooler pipes*6pcs.

Reinstall the air cooler and accessories and tighten the bolts.

Reinstall the air cooler and accessories and tighten the bolts.

Job done

Job done

Project Start Time:

2024-07-02 16:20


Construction Progress:

Disassemble and inspect the air cooler and accessories.

Disassemble and inspect the air cooler and accessories.

Perform leak test on the air cooler and plug the leak.

Perform leak test on the air cooler and plug the leak.

Reinstall the air cooler and accessories and tighten the bolts.

Reinstall the air cooler and accessories and tighten the bolts.

Job done

Job done

Project Start Time:

2024-06-24 12:15


Construction Progress:

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Job done

Job done

Project Start Time:

2024-06-12 14:21


Construction Progress:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

Install new pipes and supports.

Install new pipes and supports.

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

Job done

Job done

Project Start Time:

2024-06-12 10:03


Construction Progress:

Replace M/E No. 2 cylinder cover

Replace M/E No. 2 cylinder cover

Replace M/E exhaust valve gasket No. 10

Replace M/E exhaust valve gasket No. 10

M/E High pressure oil pump platform replacement

M/E High pressure oil pump platform replacement

Job done

Job done

Project Start Time:

2024-06-09 09:52


Construction Progress:

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Job done

Job done

< 1...678...15 >