M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

Project Name:

M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

Project Start Time:

2024-06-12 14:21


Decoration style:

othere

Project description:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied


Progress:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

1.M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied
2.Make a new supports. Since the size of the old supports is too long, it may be impossible to install, so we cut off a small section of the supports, and re-welded it, and the fabricated supports can be effectively installed.

Progress:

Install new pipes and supports.

Install new pipes and supports.

Adjust the position of the new pipe and install it along with the gasket and screws, after which install the new bracket and tighten the screws.

Progress:

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

Remove the LO sampling pipe, make a hole in the bottom of the pipe using a special tools, and install a new sampling valve, and finally re-install the pipe.

Progress:

Job done

Job done