M/E High pressure oil pump platform replacement for MSC CHINA

Project Name:

M/E High pressure oil pump platform replacement for MSC CHINA

Project Start Time:

2024-06-09 09:52


Decoration style:

othere

Project description:

At ship's request, the SEAWAVE service team conducted the service on board MSC CHINA in Shanghai Port on 24thMay,2024 to 26thMay,2024.


Progress:

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Close valves, remove platforms, railings, insulation and pipes (oil and tracing pipes).

Disassemble the railings and platformsDisassemble the pipes(oil pipe & tracing pipe)Remove the platformFinished the dismantle

Progress:

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

Replace the platform and re-install the oil pipe and insulation, and weld the platform joints.

The new platformInstall the new platform and bolt tightenRe-install oil pipe and insulationRepair welding

Progress:

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Starting the M/E to run the pressure test, check that the pressure test is normal, stop the M/E, and re-install the railings, tracing pipes and insulation.

Progress:

Job done

Job done

Finally, the steam valve is opened for steam test and no leakage is checked.