Project Name:
Finish the warranty claims for M/V CMA CGM SORBONNE
Project Start Time:
2024-07-15 14:57
Decoration style:
othere
Project description:
As the required of CMA CGM, CMD service team attended on subject vessel CMA CGM SORBONNE during YangShan port on 25th --27 th June,2024.NingBo port on 21th,Mar,2024
Progress:
Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken
Supply new support beam;Dismantled HP pipes and attached;Dismantled/remove valve blocks;Remove damaged beam and shifting to platform;Install new support beam;After assembled HP pipe & handrails & tighten torque bolts to 80Nm
















Progress:
Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak
Fabricated new pipe and replacement Remove old pipe;Old pipe;Fabricated new pipe and installation;Leakage point;Repair by Belzone




Repair the leakage point by Belzona




Progress:
Claim M-1039 ME top bracing n°3 damaged - internal breakage










Progress:
Job done
Claim M-0951 M/E beam above FOP & SOP cracked and Claim M-0994 Cylinder lubrification copper pipe wear
Welding the crack and grinding.
Unit No.1-12 Isolate the interference position with Teflon gasket





