Project Name:
Project Start Time:
2024-02-04 08:39
Construction Progress:
Cooler overhaul cleaning and gasket replace
Cooler overhaul cleaning and gasket replace
HATCH COVER WHEEL REPAIR
HATCH COVER WHEEL REPAIR
LINK ASSEMBLY REPAIR
LINK ASSEMBLY REPAIR
LINK ASSEMBLY LOWER EYE BORING
LINK ASSEMBLY LOWER EYE BORING
Project Name:
Project Start Time:
2024-02-03 14:11
Construction Progress:
Reason Of Service
Reason Of Service
NO.3 Unit Aux Engine Overhaul
NO.3 Unit Aux Engine Overhaul
Unit No.2 Overhaul
Unit No.2 Overhaul
Job done
Job done
Project Name:
Project Start Time:
2024-02-01 18:12
Construction Progress:
Remove accessories, brackets and frames for # 1 and # 2 air coolers.
Remove accessories, brackets and frames for # 1 and # 2 air coolers.
Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.
Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.
Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position
Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position
Job done
Job done
Project Name:
Project Start Time:
2024-01-31 18:43
Construction Progress:
M-0465 M/E NO.08 PISTON ROD STUFFING BOX OVERHAULING
M-0465 M/E NO.08 PISTON ROD STUFFING BOX OVERHAULING
replace 2pcs housing rings
replace 2pcs housing rings
M-0562 MAIN ENGINE CYL #O6 EXHAUST VALVE AIR SPRING PISTON FAILURE
M-0562 MAIN ENGINE CYL #O6 EXHAUST VALVE AIR SPRING PISTON FAILURE
ME CYL #O6 FWD PI & PRECHAMBER FAILURE
ME CYL #O6 FWD PI & PRECHAMBER FAILURE
Project Name:
Project Start Time:
2024-01-25 15:09
Construction Progress:
Rcvd order from owner sockets stuck
Rcvd order from owner sockets stuck
Contacted with port control for gantry crane assistance
Contacted with port control for gantry crane assistance
Cut off damaged sockets
Cut off damaged sockets
Job done
Job done
Project Start Time:
2024-01-24 09:15
Construction Progress:
Setting Erecting scaffolding
Setting Erecting scaffolding
Check/inspection lose rivets area and Fixed insulation plates with stainless steel rivets
Check/inspection lose rivets area and Fixed insulation plates with stainless steel rivets
Fixed insulation plates with stainless steel rivets on second area
Fixed insulation plates with stainless steel rivets on second area
Job done
Job done
Project Start Time:
2024-01-23 14:41
Construction Progress:
Before repair building scaffolding
Before repair building scaffolding
Removed damage sheet and checked support frame
Removed damage sheet and checked support frame
Replaced new plate sheet by rivet
Replaced new plate sheet by rivet
Job done
Job done
Project Name:
Project Start Time:
2024-01-23 11:01
Construction Progress:
Remove the impeller from the old electric motor
Remove the impeller from the old electric motor
Remove the old electric motor
Remove the old electric motor
Install electric motor + fan + “close fan”
Install electric motor + fan + “close fan”
Job done
Job done
Project Name:
Project Start Time:
2024-01-22 11:34
Construction Progress:
Determine mounting locations and wiring paths
Determine mounting locations and wiring paths
Welded feedthroughs
Welded feedthroughs
Threading network and power cables
Threading network and power cables
Welded flat iron wire shelves and camera mounts
Welded flat iron wire shelves and camera mounts
Project Name:
Project Start Time:
2024-01-19 09:41
Construction Progress:
GCR-171:ME unit No.1 EXV
ME EXV#1 Overhaul replace old exhaust valve with new gasket&O-ring as spare parts.
GCR-172:ME unit No.3 EXV
Overhaul:Gasket spare parts replaced
GCR-173:ME unit No.2&No.4--No.11 EXV
Due to the loosening of the bolt, the working pressure does not meet the requirements, and the bolt needs to be re-tightened by hydraulic pressure to 1500bar
Job done
Job done
Project Name:
Project Start Time:
2024-01-15 20:30
Construction Progress:
Disassemble Steering Gear Oil Pumps At Workshop, Cleaned And Inspection.
Disassemble Steering Gear Oil Pumps At Workshop, Cleaned And Inspection.
Check Wear Condition Of All Components.
Check Wear Condition Of All Components.
Measured, Inspection, Grinding & Repair Parts
Measured, Inspection, Grinding & Repair Parts
Reassemble the Oil Pump and test
Reassemble the Oil Pump and test
Project Name:
Project Start Time:
2024-01-12 15:36
Construction Progress:
Name plate and rewinding
Name plate and rewinding
Cover seat was damage need bushing
Cover seat was damage need bushing
Shaft/rotor test
Shaft/rotor test
Bearing replaecd
Bearing replaecd