Project Start Time:

2024-02-04 08:39


Construction Progress:

Cooler overhaul cleaning and gasket replace

Cooler overhaul cleaning and gasket replace

HATCH COVER WHEEL REPAIR

HATCH COVER WHEEL REPAIR

LINK ASSEMBLY REPAIR

LINK ASSEMBLY REPAIR

LINK ASSEMBLY LOWER EYE BORING

LINK ASSEMBLY LOWER EYE BORING

Project Start Time:

2024-02-03 14:11


Construction Progress:

Reason Of Service

Reason Of Service

NO.3 Unit Aux Engine Overhaul

NO.3 Unit Aux Engine Overhaul

Unit No.2 Overhaul

Unit No.2 Overhaul

Job done

Job done

Project Start Time:

2024-02-01 18:12


Construction Progress:

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Job done

Job done

Project Start Time:

2024-01-31 18:43


Construction Progress:

M-0465 M/E NO.08 PISTON ROD STUFFING BOX OVERHAULING

M-0465 M/E NO.08 PISTON ROD STUFFING BOX OVERHAULING

replace 2pcs housing rings

replace 2pcs housing rings

M-0562 MAIN ENGINE CYL #O6 EXHAUST VALVE AIR SPRING PISTON FAILURE

M-0562 MAIN ENGINE CYL #O6 EXHAUST VALVE AIR SPRING PISTON FAILURE

ME CYL #O6 FWD PI & PRECHAMBER FAILURE

ME CYL #O6 FWD PI & PRECHAMBER FAILURE

Project Start Time:

2024-01-25 15:09


Construction Progress:

Rcvd order from owner sockets stuck

Rcvd order from owner sockets stuck

Contacted with port control for gantry crane assistance

Contacted with port control for gantry crane assistance

Cut off damaged sockets

Cut off damaged sockets

Job done

Job done

Project Start Time:

2024-01-24 09:15


Construction Progress:

Setting Erecting scaffolding

Setting Erecting scaffolding

Check/inspection lose rivets area and Fixed insulation plates with stainless steel rivets

Check/inspection lose rivets area and Fixed insulation plates with stainless steel rivets

Fixed insulation plates with stainless steel rivets on second area

Fixed insulation plates with stainless steel rivets on second area

Job done

Job done

Project Start Time:

2024-01-23 14:41


Construction Progress:

Before repair building scaffolding

Before repair building scaffolding

Removed damage sheet and checked support frame

Removed damage sheet and checked support frame

Replaced new plate sheet by rivet

Replaced new plate sheet by rivet

Job done

Job done

Project Start Time:

2024-01-23 11:01


Construction Progress:

Remove the impeller from the old electric motor

Remove the impeller from the old electric motor

Remove the old electric motor

Remove the old electric motor

Install electric motor + fan + “close fan”

Install electric motor + fan + “close fan”

Job done

Job done

Project Start Time:

2024-01-22 11:34


Construction Progress:

Determine mounting locations and wiring paths

Determine mounting locations and wiring paths

Welded feedthroughs

Welded feedthroughs

Threading network and power cables

Threading network and power cables

Welded flat iron wire shelves and camera mounts

Welded flat iron wire shelves and camera mounts

Project Start Time:

2024-01-19 09:41


Construction Progress:

GCR-171:ME unit No.1 EXV

ME EXV#1 Overhaul replace old exhaust valve with new gasket&O-ring as spare parts.

GCR-172:ME unit No.3 EXV

Overhaul:Gasket spare parts replaced

GCR-173:ME unit No.2&No.4--No.11 EXV

Due to the loosening of the bolt, the working pressure does not meet the requirements, and the bolt needs to be re-tightened by hydraulic pressure to 1500bar

Job done

Job done

Project Start Time:

2024-01-15 20:30


Construction Progress:

Disassemble Steering Gear Oil Pumps At Workshop, Cleaned And Inspection.

Disassemble Steering Gear Oil Pumps At Workshop, Cleaned And Inspection.

Check Wear Condition Of All Components.

Check Wear Condition Of All Components.

Measured, Inspection, Grinding & Repair Parts

Measured, Inspection, Grinding & Repair Parts

Reassemble the Oil Pump and test

Reassemble the Oil Pump and test

Project Start Time:

2024-01-12 15:36


Construction Progress:

Name plate and rewinding

Name plate and rewinding

Cover seat was damage need bushing

Cover seat was damage need bushing

Shaft/rotor test

Shaft/rotor test

Bearing replaecd

Bearing replaecd