M/V WAN HAI A10:Air cooler repair

Project Name:

M/V WAN HAI A10:Air cooler repair

Project Start Time:

2024-02-01 18:12


Decoration style:

othere

Project description:

Received the notice from the manufacturer, the air cooler needs to be repaired.


Progress:

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Progress:

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Progress:

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Progress:

Job done

Job done