Project Name:
M/V MSC RAYA:M/E EXV Repair
Project Start Time:
2024-01-19 09:41
Decoration style:
M/E Overhaul
Project description:
At the request of MSC, the CMD service team conducted the service on board MSC RAYA in Ningbo Port on 28th.Dec.2023.
Progress:
GCR-171:ME unit No.1 EXV
Dismantled the attached from M/E CLY #1
Remove expansion joint
Remove EXV valve complete from M/E
Clean the exhaust valve seat surface and replace it with a new gasket
Reinstall the expansion joint, replace the exhaust valve and apply sealant, reinstall and tighten the bolts and mounting accessories
Remove the old exhaust valve and top/bottom housing
Cleaning and replace o-ring,Re-assemble guide bush
Assemble stem and top housing, tighten bolts
After assembly,cleaning the old cylinder cover and preserve,as spare parts.
Replace new exhaust valve.

















Progress:
GCR-172:ME unit No.3 EXV
Dismantled the attached from M/E CLY #3
Remove expansion joint
Check the exhaust valve base and find leaks,and cleaning
Replaced EXV seat surface gasket
Re-assemble exhaust valve






Progress:
GCR-173:ME unit No.2&No.4--No.11 EXV
No.2, No.4--No.11 exhaust valve measuring working pressure is less than 1500bar
The bolts should be hydraulically tightened again, and working pressure after tightening should reach the required 1500bar





Progress:
Job done