Project Name:
Repair service for M/V MAERSK CINCINNATI
Project Start Time:
2024-05-16 14:32
Decoration style:
othere
Project description:
At ship's request, the SEAWAVE service team conducted the service on board MAERSK CINCINNATI in Nansha Port on 14th.May.2024.
Progress:
EGR blower drain pipe repaired
After check the blower drain pipe and repaired the damaged location by welding and polished.



Progress:
Cylinder cooling water outlet pipe repaired
After inspection the cooling water outlet pipe , repaired the damaged location by welding.




Progress:
Maintenance of the M/E turning gear
Disassemble the turning gear and replaced gearwheel to repaired , then the turning gear is reassembled and the gear rotation test is carried out.





Progress:
Job done
Job done