Project Name:
M/V MSC METTE:Multiple repairs
Project Start Time:
2024-04-24 15:47
Decoration style:
othere
Project description:
According to the information provided by the owner,the vessel has multiple damage and leaks that require repair and replacement, so the SEASAVE service team were at the port of shanghai on17th.Apr.2024 to carry out the work.
Progress:
Checking and dismantle Bridge、Master and CO cabins old window
Hoist up the new window
Checking and dismantle accessory and bolts
Install new window and all accessory








Progress:
Check AE No.3 Exh. Gas Pipe EGE、EGB exhaust gas、EGE #1 #3 exh.gas leakage
Check AE No.3 Exh. Gas Pipe EGE、EGB exhaust gas、EGE #1 #3 exh.gas leakage
Remove the insulation foam and iron sheet
Clean and welding leakage area
Welding the they
Reinstall accessories and tighten bolts














Progress:
Check、dismantle and clean No.3 No.5 GE Alternator bearing accessory and bolts
Check、dismantle and clean No.3 No.5 GE Alternator bearing accessory and bolts,and check shaft seal installation position
Install the new shaft seal
Test and adjust the installation position










Check and clean the vent pipe leak area,Repair with iron cement&Test for leakage





Progress:
Job done
