Project Name:
M/V MARSEILLE MAERSK: inlet crack repair
Project Start Time:
2024-03-04 13:41
Decoration style:
othere
Project description:
There are leakages on both side of inlet duct of two marine scrubbers.Needs to be repaired
Progress:
Background
There are leakages on both side of inlet duct of two marine scrubbers.
1.Portside 2.Starboard


Progress:
Preparation
We removed the insulation of the duct and found that there was a crack at each end of the air duct,
which was consistent with the result of corrosion from the appearance:








Proceed cleaning and lapping






Progress:
inlet crack repair
Add fix plate above the crack so that crack is in the middle of the plate and plate is aligned with the crack direction:



Welding the plates




Hammering and grinding smooth




PT checking after welding




Progress:
Job done


Service Hotline
Mailbox:leo@seawave-engineering.com(Domestic)
Add:No.745,Zhong Henggang road , FengXian District,ShangHai ,China