Project Name:
M/V EVEA ARIA:Heat tracing pipe repair
Project Start Time:
2024-02-13 10:59
Decoration style:
othere
Project description:
Reworking of the mainframe heat tracing pipe and installation
Progress:
Remove the M/E old tracing pipe
After checking the old trace pipe, close the valve and remove the pipe.
Check pipe and close valve Dismantle pipe Disassembly complete



Progress:
Install and connect the new tracing pipe
Assemble the new tracing pipe that has been made, adjust it to the appropriate position, install the reinforcement, bolt tighten, and finally connect it.
Make reinforcement block
Install pipe and reinforce
Bolt tighten
Connecting and reinforce








Progress:
Steam test
After the tracing pipe is connected, open the valve to vent steam,if the steam is successfully vent, the installation is complete.

Progress:
Job done