Claim issues for M/V CMA CGM AMAZONIA

Project Name:

Claim issues for M/V CMA CGM AMAZONIA

Project Start Time:

2024-12-23 13:48


Decoration style:

othere

Project description:

As the required of CMA CGM, our service team attended on subject vessel CMA CGM AMAZONIA during YangShan port on 11th,Dec,2024.


Progress:

E-0024 :GMS OPERATION PANEL”DAMPER TWIST”SHOWING HIGH VALUE

Add /welding stiffeners between cover and GMS sensor.

Remove cover and GMS sensor support / Remove sensor /Add stiffeners between cover and GMS sensor and install back

Progress:

M-0039 :ME UNIT 8 CROSSHEAD FEED OIL INLET PIPE MINOR CRACK AT REINFORCEMENT WELDING AREA

According to the ship’s request replace new design hoses at unit 1.4.5.8.9

Delivery new sign hoses 9pcs/ Replace new hose for unit.1 unit. 4 unit. 5 unit. 8 unit. 9

Progress:

M-0043 : M/E ICER NO.1 PURGE BLOWER MOTOR BLADE

Delivery& Replace new blade and bearing.

New bearing was delivery and install / Reinstall end cover / Install new blade / Refit back blade housing

Progress:

M-0046: M/E ICER NO.2 PURGE BLOWER MOTOR BURNT

Delivery& Replace new motor

Remove foundation and pipe / Remove pump and motor /Remove pump cover/Remove silencer &pump body &impeller/Damaged motor/Install new motor, Reassemble pump /Reassemble impeller/Reassemble pump cover/Reassemble silencer/Reposition foundation, refit back pipe, cable connection and test by shipside