A/E OVERHAUL  FOR M/V CAPE RAINBOW

Project Name:

A/E OVERHAUL FOR M/V CAPE RAINBOW

Project Start Time:

2024-11-15 16:07


Decoration style:

A/E OVERHAUL

Project description:

A/E NO1&No2&No3 Need Carry Out Overhaul In Dry Dock At Changhong Shipyard,


Progress:

Reason Of Service

Reason Of Service

A/E NO1&No2&No3  Need Carry Out  Overhaul In Dry Dock At Changhong Shipyard

A:  A/E No 2 D/G
1-No2 D/G Engine  Cyl NO1 to No 5 Units Cylinder Covers To Be Opened Up  for  cleaning /carbonized  exhaust valve set&spindle replaced ,o-ring replaced ,cooling weater jacket cleaned /o-ring replaced/presure testing 
2-Liner pulled up and o-ring replaced
3-Cyl No 2 exhaust valve set&spindle replaced,No 3 main valve set &spindle replaced.
4-Cyl No 4 exhaust valve set&spindle replaced,No 5 exhaust valve set&spindle replaced.
5-Piston unit cleaned and measurment.
6-Liner to Be cleaned measured and recorder, liner is good condition,replaced oring.
B:  A/E No 1 D/G
1-No1 D/G Engine  All Units Cylinder Covers To Be Opened Up  and overhauled.
2-Cyl No1 to No5 be cleaned and replaced valve set,guide and spindle.
C:  A/E No 3 D/G
1-  D/G Engine  Cyl NO1 to No5 cyl cover Units for overhauled.
2- Cyl No1 to No5  be cleaned  and replaced valve seat,guide,spindle.
D:  All 3 unit D/E runing testing and load test continue.

Progress:

Unit No.2 OVERHAUL

Unit No.2 OVERHAUL


Model nameplate,Dismantle parts necessary,CYL cover open by 550 bar hydraulice tools,Dismantle Cyl unit for NO1 to No 5,Cyl cover cleaned and exhauxt vavle seat replaced,Guide replaced,Inlet vavle lapping,New oring and spindle&valve seat supplied,Guide for injector holder replace,Cyl cover leakage testing,Liner measurements found normal,Take out the liner,Frame cleaning,Liner cleaning,Oring replaced,Liner reinstall,Piston unit cleaning&assembly,Accessory assembly,Crank case cleaned

Progress:

Unit No.3 OVERHAUL

Unit No.3 OVERHAUL

Dismantle parts nesscery,Open cyl cover,Cyl cover cleaning,Valve set replaced,Spindle replaced,Reinstall

Progress:

Unit No.1 OVERHAUL

Unit No.1 OVERHAUL

Take out cly cover,Cly cover cleaning,Leaking test,Test running found normally