Exhaust pipe replace for M/V KOTA PELANGI

Project Name:

Exhaust pipe replace for M/V KOTA PELANGI

Project Start Time:

2024-11-11 09:43


Decoration style:

othere

Project description:

As Requested, our service team provided service in Singapore/Shanghai/Ningbo/Yantian for a total of 21 days since 18 October 2024 respectively. The reason for the attendance was to provide exhaust pipe replacement service.


Progress:

Preliminary engineering assessment and preparatory work

Preliminary engineering assessment and preparatory work

Exhaust pipe before repair size Ø1800MM x 6.8Mtr
Supply the material for build scaffolding at singapore and arange engineer build the lifting for prepare the job start at shanghai calling
Prepare material and supply at shanghai calling

Progress:

Cutting and dismantling the exhaust pipe then Lifting and welding exhaust pipes

Cutting and dismantling the exhaust pipe thenLifting and welding exhaust pipes

Cutting and dismantle the exhaust pipe
Lifting and install /welding from shanghai/ningbo/yantian terminal

Progress:

Vessel stay at anchorage 3days for install complate.

Vessel stay at anchorage 3days for install complate.

Progress:

Paiting by high tempreture paint

Paiting by high tempreture paint