Project Name:
Exhaust pipe replace for M/V KOTA PELANGI
Project Start Time:
2024-11-11 09:43
Decoration style:
othere
Project description:
As Requested, our service team provided service in Singapore/Shanghai/Ningbo/Yantian for a total of 21 days since 18 October 2024 respectively. The reason for the attendance was to provide exhaust pipe replacement service.
Progress:
Preliminary engineering assessment and preparatory work
Exhaust pipe before repair size Ø1800MM x 6.8Mtr
Supply the material for build scaffolding at singapore and arange engineer build the lifting for prepare the job start at shanghai calling
Prepare material and supply at shanghai calling






Progress:
Cutting and dismantling the exhaust pipe then Lifting and welding exhaust pipes
Cutting and dismantle the exhaust pipe
Lifting and install /welding from shanghai/ningbo/yantian terminal








Progress:
Vessel stay at anchorage 3days for install complate.















Progress:
Paiting by high tempreture paint