Windlass repair for M/V BILLIE

Project Name:

Windlass repair for M/V BILLIE

Project Start Time:

2024-08-04 11:42


Decoration style:

othere

Project description:

As Requested, Our Service Team Attended The Subject Vessel On 22th—25th Jule 2024, During Her Alongside At Wusong Port SHA China. The Reason For Attendance Was Provide Service For Windlass Repair Job.


Progress:

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

Progress:

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

Progress:

PT for chain drum and Anchor test

PT for chain drum and Anchor test

Progress:

Job done

Job done