AE Overhaul for KONYA

Project Name:

AE Overhaul for KONYA

Project Start Time:

2023-11-13 12:09


Decoration style:

AE Overhaul

Project description:

A/E NO1&No2&No3 Need Carry Out Inspection During Vessel In Dry Dock At YouLian Shipyard


Progress:

A/E No 1 D/G

A/E No 1 D/G

1-No1  D/G Engine  Cyl NO 2 & No 4& No 5 Units Cylinder Covers To Be Opened Up  for inspection conecting rod ,bearing of conecting rod ,main bearing .
2-Cyl No 2 connecting rod bearing and main bearing is good condition
3-Cyl No 4 connecting rod bearing replaced,No 4 main bearing replaced
4-Cyl No 5 connecting rod bearing replaced,No 5 main bearing replaced
5-Piston unit cleaned and measurment ,piston ring /bolts replaced
6-Liner to Be cleaned measured and recorder, liner is good condition  
7-thrust washer inspection clearance is normal
8-Lub oil cooler dismantled and cleaned gasket replaced

Progress:

A/E No 2 D/G

A/E No 2 D/G

1-No2  D/G Engine  All Units Cylinder Covers To Be Opened Up  for inspection conecting rod ,bearing of conecting rod ,main bearing .
2-conceting rod measurment was ovality , replaced new .and old one recondation 
3-Cyl No 3  main bearing replaced

Progress:

A/E No 3 D/G

A/E No 3 D/G

1-  D/G Engine  Cyl NO 3 & No 4 Units   for inspection conecting rod
2- Cyl No 3 Connecting rod bearing renewal
All 3 unit D/E runing testing and load test continue

Progress:

Job Done

Job Done